2 ofertas

Año de construcción: usado
Ubicación: Land-80 mw pratt & whitney ft8 gas turbine power plant
two (2) 29 mw pratt whitney ft8-3 swiftpack single shaft gas turbines with air cooled brush generators, fuel: natural gas (ng), 3000 rpm, 50 hz, commissioned in 2010, 2 steam turbines included in this package, transformers, condensers, electrical systems, control systems, cooling systems compressor systems, starting system, lubricating system, fire fighting system and much more. complete plant in good condition and selling below market value, contact us to set up inspection.
  80 MW PRATT & WHITNEY FT8 GAS TURBINE POWER PLANT TWO (2) 29 MW PRATT WHITNEY FT8-3 SWIFTPACK SINGLE SHAFT GAS TURBINES WITH AIR COOLED BRUSH GENERATORS, FUEL: NATURAL GAS (NG), 3000 RPM, 50 HZ, COMMISSIONED IN 2010, 2 STEAM TURBINES INCLUDED IN THIS PACKAGE, TRANSFORMERS, CONDENSERS, ELECTRICAL SYSTEMS, CONTROL SYSTEMS, COOLING SYSTEMS COMPRESSOR SYSTEMS, STARTING SYSTEM, LUBRICATING SYSTEM, FIRE FIGHTING SYSTEM AND MUCH MORE. COMPLETE PLANT IN GOOD CONDITION AND SELLING BELOW MARKET VALUE, CONTACT US TO SET UP INSPECTION.
Vendedor: Brown Energy Group Inc
Año de construcción: usado
Ubicación: Land-we are a power systems that our named popullar is pratt & whitney  and we are a 
subsidiary of mitsubishi industries ltd.

as we are a manufacturer some models of gas turbines in a differences volumes.

•	gas turbines 

 > 	30 mw mobile
the model # ft8®mobilepac®gas  turbine package : dual fuel , water injection
the instalation will take only 8 hours
the fuel is liquid and gas

 >	30-60 mw
the model # ft8® swiftpac®gas turbine power plant provides quick, 
reliable power instalation that takes less than 30 days.


 >	60-140 mw
the  ft8® swiftpac® combined – cycle plant that provides high-efficiency,
low cost of power and low emissions.


 >	epc services 
also we give an epc service as according your needs.


      WE ARE A POWER SYSTEMS THAT OUR NAMED POPULLAR IS PRATT & WHITNEY AND WE ARE A SUBSIDIARY OF MITSUBISHI INDUSTRIES LTD. AS WE ARE A MANUFACTURER SOME MODELS OF GAS TURBINES IN A DIFFERENCES VOLUMES. • GAS TURBINES > 30 MW MOBILE THE MODEL # FT8®MOBILEPAC®GAS TURBINE PACKAGE : DUAL FUEL , WATER INJECTION THE INSTALATION WILL TAKE ONLY 8 HOURS THE FUEL IS LIQUID AND GAS > 30-60 MW THE MODEL # FT8® SWIFTPAC®GAS TURBINE POWER PLANT PROVIDES QUICK, RELIABLE POWER INSTALATION THAT TAKES LESS THAN 30 DAYS. > 60-140 MW THE FT8® SWIFTPAC® COMBINED – CYCLE PLANT THAT PROVIDES HIGH-EFFICIENCY, LOW COST OF POWER AND LOW EMISSIONS. > EPC SERVICES ALSO WE GIVE AN EPC SERVICE AS ACCORDING YOUR NEEDS.
Vendedor: Hadar Trading Ltd
Usted no ha encontrado su máquina deseada? enviar consulta a todos los distribuidores (no hay registro necesario)