Working height: 820-900mm, max. film width: 550mm, output: 60 cycles/min, product width: 25-450mm, product height: 2-200mm, product length: 80mm to unlimited, connected load: 3kW, length: 2140mm, width: 1450mm, weight: 650kg, with documentation.
With documentation, an inspection is possible.
With documentation and some accessories, an on-site inspection is possible, but not under power.
Seven tubular bag machines from Affeldt are available: Two E350 DV models (built in 1999 and 2004 with around 3 million packs and 192,460 operating hours), three AVN E350 D models (built in 1999, 2014 and 2014 with 3.7 million packs and operating hours of 14,405 and 16,305 respectively) and two AVN E350 DN models (built in 2001 and 2002 with around 5.2 million packs). The machines produce approx. 22 packs of 2.5 kg per minute. They are offered without printers and labelers. Individual sale of the machines is possible.
Welding frame dimensions: 650x550mm, product dimensions: 130-550x30-450x20-240mm, connected load: 13.5kW, length: 3515mm, width: 1416mm, weight: 880kg, with documentation.
Opening dimensions: 550x300mm, tunnel length: 1150mm, connected load: 7kW, weight: 215kg, with conveyor belt and documentation.
Max. welding width: 600mm, opening height: 280mm, packing length/ height: 450/ 170mm, output: 20 packages/min, max. film roll diameter: 250mm, compressed air supply: 6bar, length: 2830mm, width: 1344mm, height: 2014mm, with documentation.
Output: 30-50/min, connected load: 20kW, length: 9500mm, width: 3500mm, height: 2200mm, including documentation.
Welding frame format: 550x410mm, packing dimensions welding/ shrinking: 530x390x200/ 500x360x200mm, film width: 200-500mm, roll diameter: 260mm, connected load: 2.6kW.
Welding bar dimensions: 500x380mm, max. film roll dimensions: 300x600mm, max. pachaging dimensions: 500x380x200mm, length: 1275mm, width: 700mm, height: 1095mm.
Operational hours: ca. 2200h, including gripper feeder and Shrinking Tunnel PACKTECH Minipack.
Operational hours counter: ca. 200h, with spare parts, documentation shrinking tunnel, inspection is possible, but not under power.