Kawasaki Model TD80A-1 7.2 MW Type TD80A Rated Output 7216 kW Voltage 11000 V Frequency 50 HZ Current 446 A Phase 3 Gas Turbine M7A-03D Generator NTAKL-DC YOM 2011 low hours 7836
Hydroelectric power station - Power 790 kW composed of: 1 Turbine Pelton / Effective gradient 223m / Water volume 400 l/s / 1 piece generator 1 shut-off device 1 hydraulic power unit 1 piece transformer ... mais informação
Steam turbine Siemens SST400 Year: 2011 Disassembled and put in a storage. Very low working hours. Power:30mW Voltage:10.5kV/50Hz Fuel: Biomass Generator: SGen5-100A-4P Turbo gear unit Flender-Graffenstaden TX80/3 Transformer Siemens S10-40000/110 Condenser Full set of manual books No boilers, no voltage control cabinet (7) Steam turbine Siemens SST-400 Year: 2011 Never used and never installed. Still in original wooden crates. Packing lists. 7 sets available Power:30mW Voltage:10.5kV/50Hz Fuel: Biomass Generator: SGen5-100A-4P Control system Accessories Full set of manual books No boilers Price: on request
SGT 400 YOC 2010, 10.000 hours only 6 years in operation at peak load conserved 50 Hz 11 kV 14,300 kVA 1500 rpm still complete installed. relocation can be offered ... mais informação
2 x SOLAR SATURN 20 for sale. Package is complete, still installed and now FOR SALE 1.1mw each... Total 2.2 mw serious inquires and end user buyers only please email for further information. Basic details will be uploaded soon here on this page. ... mais informação
Emergency power gas turbine from 1977 with few running hours, without generator and controller. 1 available 456 KW x 1,500 1/min Manafacture: Garrett Model No.: ME831-800A Type: Gas turbine Serial Number: P-830005 Power [KW]: 456 Year of construction: 1977 Weight [kg]: 915 Dimensions LxWxH [cm]: 270x120x120
537 KW Tuthill Nadrowski back-pressure steam turbine C4. S-GIII from 2004, only turbine (was used as a pump). 1 available inlet pressure 90 bar, outlet pressure 18 bar, Price: € 19,500 each, plus VAT and FCA-free Manufacturer: TUTHILL Nadrowski Model: C4. S-G III Type: Steam Back Pressure Serial Number: 21004 Power [kW]: 537 Pressure inlet [bar]: 90 Pressure outlet [bar]: 18 Speed (rpm) 3.554 Year of construction: 2004 Weight [kg]: 2.440 Dimensions LxWxH [cm]: 370x138x174
Turbine Turbine operating hours: 30,000h Backpressure turbine Manufacturer: Kkk First start-up: 2002 Type: CFR5 G6a Power max: 2500 kW Operating efficiency: 2200 kW, Number of revolutions: 23000 rpm, Live steam pressure: 65 bar, Live steam pressure temperature: 480 C, Evaporation pressure: 1-17 bar, Investments in 2002 , Entire steam transformation station renewed from 63 bar to 2.5 bar in 2002, El. Generator Fa. Leroy Somer, el. Power 2 MW, 525 V, 2488 kVA, renewed, complete measurement, control and control of the turbine renewed, steam turbine renewed with energy production General overhaul of the entire plant from 2002 to 2004, steam generator renewed, automatic corder and ash removal system renewed, water treatment plant renewed, complete instrumentation renewed, flue gas cleaning plant Lurgie renewed from 1991 - 2001 Mistakes excepted!
Make and model: Turboden ORC Year: 2016 Electrical capacity: Ran at 700kW (Normal rating: 643 kW) V: 400 HZ: 50 Now available for sale. Price: 400,000 GBP ... mais informação
Turbogas Turbine GE5/1 5MW Natural gas for sale. Complete turbogas turbine plant with electric generator, recovery boiler and exchangers, dry cooler, diverter. Total Hours: 36,000 8,000 hours from the last overhaul. THERMAL POWER 9,0 MWt Saturated steam production 13,000 kg/h at 10BARg Voltage 11000 V Frequency 50 hZ Also available: - GE5/1 used turbine in nitrogen storage with 72,000 hours + 8,000 Hours after the last overhaul + one used generator. Price: €300,000 - NEW GE5 Turbine Spare Parts (value 1 million). Price: €400,000
The power plant, based on a 5 MW gas turbine CENTRAX 501 KB7 is complete with all needed equipment, allowing a steam output of 20 tons per hour at 20 bar. From ZERO hours until the last working day all maintenance was performed by Centrax under full maintenance contract. ... mais informação
215 MW Toshiba Inlet Steam Turbine & Generator (Unused and well maintained) New in 2008, this Power Plant has never been used and is available for immediate inspection and delivery. Never having been used, the Plant has no wear whatsoever. The Steam Turbine: Extraction & condensing, Inlet pressure: 104 bar, Output: 215MW Extractions: MP2: 22 bar, MPI: 10 bar, LP: 4.5 bar, Feed Water: 0.4 bar Minimum load: • No extractions, Only bleeds, Steam flow: 45 kg/s Maximum load: Steam flow: 270 kg/s The turbine is a Single Flow Extraction Condensing type. Steam initially enters the steam inlet flange near the end of the high pressure section and flows through the turbine stages toward the generator end of the unit. After passing through the turbine stages, the steam is exhausted to condenser. The exhaust hood is keyed to the foundation plates at a point near its ce ...
Complete 96 MWe gas fired black start/ peak load power station, consisting of 4 (four) GE Frame 5N Gas Turbine Sets 24 MW each. Each set consists of a: • Gasturbine • Generator • Diesel Engine • Main Gearbox • Auxiliary Gearbox • Speedtronic Mark II control system • Exhaust plenum • Air inlet filter house 125 MVA transformer With or without building. additional info on request.
1 x Steam turbine generator 3817 KW KKK Siemens CFR5 G6b 5,000 KWe x 1,500 rpm 50 Hz 6,300 V for sale in operational condition Turbine Manufacturer KKK Siemens Model CFR5 G6b Steam pressure fresh [bar] 64 Dampfdr. Ed. [bar] 8.5 Generator Manufacturer INDAR Model BZK-710-S/A-4 P Generator [KW] 5.000 Turn around. [per min] 1,500 Frequency [per sec] 50 Voltage [V] 6,300 Current [A] 458 Scope of delivery: The system has been completely dismantled and is complete including the control system. Technical documentation: available Spare parts / tools: not available The plant was dismantled in working order. Last major overhaul: unknown Sales are "as is" or after prior inspection by a company engaged by us on request
Turbine Nadrowski Superheated steam turbine Brand turbine factory Nadrowski Type B 5 S4+GIV/V Year of construction: 1989 for generating electricity from superheated steam Maximum steam temperature 400°C Working pressure 4-31 bar Maximum power 632 kW with Synchronous Generator AVK DKBN 100K/800-4 Power 813kVA, current 1173 A regularly serviced External dimensions approx. L 4 m x W 1.50 m x H 1.50 m
Description: Type : ÖLtransformator Version : Hermetic Make : CG POWER SYSTEMS Belgium NV B7ssq0vkzj Year of construction : 2012 Condition : New with 1 year warranty Rated power : 3500 KVA Medium voltage : 33 KV +- 2 x 5% Low voltage : 400 V Switching group : Dyn 5 Frequency : 50 Hz Cooling type : KNAN Total weight : 7750 Kg Oil weight : 1720 kg Synth. ESTER Length : 2400 mm Width : 900 mm Height : 2250 mm + 160mm cable flag Other sizes and voltages also available from 100 KVA to 3500 kva . All transformers are tested and ready for use and immediately available from our warehouse in 59557 LIPPSTADT . Nationwide delivery . For further questions available Mon to Sat. 8 a.m. to 10 p.m.
750 MW each, UNUSED Gas Based Complete Combined Cycle Power Plants 2 units available Technical Specifications: The Project Details: 1. EACH module has two Gas turbines GE 9FA.03 (DLN2+) and one Steam turbine GE D11. Each GT exhaust is directed to the triple pressure unfired, natural circulation horizontal, type CMI USA HRSG. This configuration helps turndown operation of station up to 45%. 2. The Station is based on robust design of GE Gas Turbine with high efficiency DLN2+ Dry low Nox system, each GT is site rated for an output of 235 MW and the triple pressure reheat GE D11 Steam Turbine with downstream Exhaust, is site rated at 266 MW. The HRSG is a Triple pressure, Natural circulation, Horizontal design type with Deaerator atop the LP drum. Thus Net Combined cycle efficiency at Site condition is approx 57% on LHV basis. The inherent design of the gas turbine reduced the N ...
5.5MW 60Hz KAWASAKI PUC60 ECOPLUS Gas Turbine Power Plant This is an eco-plus gas turbine power plant that has been being operated successfully for over 160,000 hours since it was manufactured in 2002 and installed. This plant has been regularly inspected and very well maintained according to the maintenance manual by the operating company. Now, the plant is scheduled to go for sale after stopping its commercial operation around June 2023. Main specification: - Gas Turbine Model: KAWASAKI PUC60 ECOPLUS - Maker: KAWASAKI - Power Output: 5,570kW - Frequency & Voltage: 60Hz & 3300V - Year of production: 2002 - Running Hours: 163,858 hours - Fuel Oil: Natural Gas - Plant Auxiliary Equipment: 1 set
The combined cycle plant consists of a gas turbine, waste heat recovery boiler, steamturbine and a generator, mounted in a single shaft configuration. The capacity of the installation is 53 MW • The prime mover of the installation is an aero derivative General Electric LM6000-PB-DLE. 40 MW - 30,000 hours remaining till next major overhaul - Running hours 74.100 hours , start 3356 - Next overhaul in 5000 hours(hot gas path) - Next major overhaul: in 30.000 hours • The Steam Turbine is a SIEMENS ENK40/53-3, with a capacity of 13 MWe. Dismantled, stored and ready for transport.