The unit is new and unsed. Please feel free to contact us should you require any additional information.
ID2919 Normet NT100 / Wetkret 4 Spray Arm year/Year of construction 2021 Normet undercarriage with Putzmeister spray mobile body, body built in 2021 Normet undercarriage with Putzmeister mobile spray body, body built in 2021
ID2788 Normet Injection & swap body for maintenance Normet undercarriage NT60 (generally revised), with 2 swap bodies (for injections with cement silo body (generally overhauled) & swap body for maintenance in the tunnel (new) (i.e. the swap body "maintenance unit" is necessary for supplying and maintaining the equipment, e.g. in tunnel construction. These are included Oil barrels, a 1000 liter diesel tank, an emergency generator, a workshop compressor and hose fittings, like at the gas station to fill up the devices with diesel or to refill oil). The maintenance unit is brand new and built as a swap body. Standardet undercarriage NT60 (completely overhauled), with 2 swap bodies (for injections with cement silo superstructure (refurbished) & interchangeable body for maintenance in tunnels (new) (i.e. the swap body "maintenance unit" is necessary for the supply and maintenance of the e ...
ID3150 Normet 9905BT year/Year of construction 2000 6690 hours/hours Tunnel lift, max. standing height 9.5 m; max. working height approx. 11.6 m Tunnel lift, max. Stand height 9.5 m; max. working height approx. 11.6 m