Steam turbine Siemens SST400 Year: 2011 Disassembled and put in a storage. Very low working hours. Power:30mW Voltage:10.5kV/50Hz Fuel: Biomass Generator: SGen5-100A-4P Turbo gear unit Flender-Graffenstaden TX80/3 Transformer Siemens S10-40000/110 Condenser Full set of manual books No boilers, no voltage control cabinet (7) Steam turbine Siemens SST-400 Year: 2011 Never used and never installed. Still in original wooden crates. Packing lists. 7 sets available Power:30mW Voltage:10.5kV/50Hz Fuel: Biomass Generator: SGen5-100A-4P Control system Accessories Full set of manual books No boilers Price: on request
Kawasaki Model TD80A-1 7.2 MW Type TD80A Rated Output 7216 kW Voltage 11000 V Frequency 50 HZ Current 446 A Phase 3 Gas Turbine M7A-03D Generator NTAKL-DC YOM 2011 low hours 7836
750 MW each, UNUSED Gas Based Complete Combined Cycle Power Plants 2 units available Technical Specifications: The Project Details: 1. EACH module has two Gas turbines GE 9FA.03 (DLN2+) and one Steam turbine GE D11. Each GT exhaust is directed to the triple pressure unfired, natural circulation horizontal, type CMI USA HRSG. This configuration helps turndown operation of station up to 45%. 2. The Station is based on robust design of GE Gas Turbine with high efficiency DLN2+ Dry low Nox system, each GT is site rated for an output of 235 MW and the triple pressure reheat GE D11 Steam Turbine with downstream Exhaust, is site rated at 266 MW. The HRSG is a Triple pressure, Natural circulation, Horizontal design type with Deaerator atop the LP drum. Thus Net Combined cycle efficiency at Site condition is approx 57% on LHV basis. The inherent design of the gas turbine reduced the N ...
16 x 3.2MW 60Hz KAWASAKI Gas Turbine Power Plant Main specifications - Gas Turbine Model: M1T-23 x 16 sets - Maker: KAWASAKI - Power Output: 3,200kWe - Frequency & Voltage: 60Hz & 6600V - Year of Production: 2008 - Running Hours: about 60 hours - Fuel Oil: Natural Gas - Plant Auxiliary Equipment: 1 set This gas turbine plant has 16 x 3.3MW gas turbines with the optimal layout of 4 x 4 blocks and was initially installed as an emergency power supply in preparation for major disasters or large-scale power outages in the area. Fortunately, as there has been no serious emergency, this plant has had almost no operation, and the total running hours does not exceed 60 hours for each unit until today. However, as the plant has been regularly checked and well maintained, now the gas turbines units are in the best condition. This power plant is scheduled to be shut down i ...
5.5MW 60Hz KAWASAKI PUC60 ECOPLUS Gas Turbine Power Plant This is an eco-plus gas turbine power plant that has been being operated successfully for over 160,000 hours since it was manufactured in 2002 and installed. This plant has been regularly inspected and very well maintained according to the maintenance manual by the operating company. Now, the plant is scheduled to go for sale after stopping its commercial operation around June 2023. Main specification: - Gas Turbine Model: KAWASAKI PUC60 ECOPLUS - Maker: KAWASAKI - Power Output: 5,570kW - Frequency & Voltage: 60Hz & 3300V - Year of production: 2002 - Running Hours: 163,858 hours - Fuel Oil: Natural Gas - Plant Auxiliary Equipment: 1 set
215 MW Toshiba Inlet Steam Turbine & Generator (Unused and well maintained) New in 2008, this Power Plant has never been used and is available for immediate inspection and delivery. Never having been used, the Plant has no wear whatsoever. The Steam Turbine: Extraction & condensing, Inlet pressure: 104 bar, Output: 215MW Extractions: MP2: 22 bar, MPI: 10 bar, LP: 4.5 bar, Feed Water: 0.4 bar Minimum load: • No extractions, Only bleeds, Steam flow: 45 kg/s Maximum load: Steam flow: 270 kg/s The turbine is a Single Flow Extraction Condensing type. Steam initially enters the steam inlet flange near the end of the high pressure section and flows through the turbine stages toward the generator end of the unit. After passing through the turbine stages, the steam is exhausted to condenser. The exhaust hood is keyed to the foundation plates at a point near its ce ...
1. General specification -Maker MES (Mitsui Engineering & Shipbuilding Co., Ltd.) Japan -Mfg. data 2014 -Running time Zero hoursP 2. Steam turbine specification -Maker MES (Mitsui Engineering & Shipbuilding Co., Ltd.) Japan -Turbine type CD30.46 -Steam in let pressure 70barG -Steam inlet temperature 490℃ -No.1 Extraction steam P & T 31.5barG & 388.5℃ -No.2 Extraction steam P & T 5.5barG & 223.3℃ -Nor. Exhaust pressure 0.11barA -Turbine speed 3,600 rpm -Rated output 97,500 kw -Weight 132 ton -Number of stages 16 -Number of 1 stage nozzle arcs 4 -Steam inlet flange ASME1500#RJ12” x 2 -No.1 extraction steam flange ASME 600#RF 16” -No.2 extraction steam flange ASME 150#RF 32” -Steam exhaust flange ø3,600(inner dia.) 3. Synchronous generator -Standard IE60034-1(2010), IEC60034-3(2007) -Location Indoor -Cooling system Totally enclosed type with top-moun ...
Condensing Steam Turbine Peter Brotherhood Ltd. (England) Power Output – 3500 kW Normal Running Speed – 7035 RPM Trip Speed – 7739/8090 RPM Steam Inlet Pressure – 40 bar G Steam Inlet Temperature – 480° C Exhaust Pressure - 0.10 bar A ... más información
TO WHOM AT MAY CONCERN ; WE VE NEW UNUSED 3 SETS NAPIER NA 307 GAS INLET& OUTLET CASINGS AND INLET ELBOWS AT OUR STOCK. 3 SETS GAS INLET & OUTLET CASINGS ARE NEW AND NEVER MONTAGED . PLS REFER SOME PICTURES ON ATTACHE IF YOU VE ANY QUESTIONS . PLS DO NOT HESITATE TO CONTACT WITH US . Capt. Ayhan Ugurluba With Kind Regards ; Aliaga Marine Services E mail: info/aliagamarine.com Phn/Fax:+90 232 618 03 90 Mobile: +905556084850 aliagamarine.com TURKEY
1 piece ABB TPL 77-B12 turbocharger complete available New In our stock in Istanbul Please contact: info@fin-marine ... más información
Complete 96 MWe gas fired black start/ peak load power station, consisting of 4 (four) GE Frame 5N Gas Turbine Sets 24 MW each. Each set consists of a: • Gasturbine • Generator • Diesel Engine • Main Gearbox • Auxiliary Gearbox • Speedtronic Mark II control system • Exhaust plenum • Air inlet filter house 125 MVA transformer With or without building. additional info on request.
The combined cycle plant consists of a gas turbine, waste heat recovery boiler, steamturbine and a generator, mounted in a single shaft configuration. The capacity of the installation is 53 MW • The prime mover of the installation is an aero derivative General Electric LM6000-PB-DLE. 40 MW - 30,000 hours remaining till next major overhaul - Running hours 74.100 hours , start 3356 - Next overhaul in 5000 hours(hot gas path) - Next major overhaul: in 30.000 hours • The Steam Turbine is a SIEMENS ENK40/53-3, with a capacity of 13 MWe. Dismantled, stored and ready for transport.
Dresser-Rand steam turbine (new price 2.8 million EUR), unused and as good as new - built 2009 - inlet steam stream 53,000 kg/h - 1 generator type Syn. 3 phases - 60 Hz, 12.3 MW - 4,500 rqm / 1,800 rqm - gearbox RENK type TL-500, BJ. 2009, GEA surface capacitor, type 2/III/H, BJ 2007, 2 condensate pumps type Etanorm G080-400 G11, BJ 2007
Pratt & Whitney gas turbine generator Model : FT8 Twin pac Power output : 48 MW Voltage : 11 KV Frequency : 50 Hz ... más información
Hydropower - Power: 240 kW consisting of: 1 piece turbine Pelton/ paygap 225m, water quantity 130 l/s, manufacturer; Escher-Wyss 1 piece generator power 240 kW, manufacturer; Barthold ... más información
SIEMENS SGT400 gas turbine generator, CCGT Model : SGT400 Rated power : 14.3 MWe at ISO condition Voltage : 11KV Frequency : 50Hz Running hour : GT#1 16026 hr ; 100 start ; GT#2 17357 hr ; 108 start ... más información
GE Model : LM6000PA Power Output : 42 MWe ISO condition Voltage : 11KV Frequency : 50Hz ... más información
Complete 48 MW Westinghouse W251-B11 Gas Turbine with a Brush electric generator, 3000 rpm, 50 HZ, 11.5 KV, ... más información
Complet gas turbine GE LM 6000 RMUGG - 04 , low time work ... más información
TO WHOM IT MAY CONCERN WE VE NEW UNUSED GENUINE SPARE PARTS OF MAN NR 34S AT OUR STOCK. NEW BEARING BUSH 1151768-0353 517003 1PCS NEW LOCATING BEARING 1151768-0580 517002 1PCS NEW NOOZLK E RING IMO 3318 129.88cm3 1PCS NEW BEARING ASSY 5891812 30021F 8PCS ALL PARTS EX STOCK LOACTED AT IZMIR TURKEY. IF YOU VE ANY FURTHER QUESTIONS PLS DO NOT HESITATE TO CONTACT WITH US .