Sheet metal warehouse, Stopa, 491 storage locations for sheet metal
1.30 x 2.50m and 1.50m x 3m, – used - :
Price ex site: 65.000.-€ (net), plus dismantling etc.
Manufacturer: Stopa
Type: SLBS 3000 UL (Fab.Nr.93449)
Year of manufacture: 1993 / Conversions in 2013 (retrofit) and 2019
Bearing height: 6,400mm
Beam (without extensions): GF: 5.26, SF: 5.17m
Length: approx. 60m
Sheet size SF: 1,300 x 2,500mm
Sheet format: GF 1,500 x 3,000mm
Load capacity per pallet: 3,000kg
Locations SF: 359
Storage locations: GF: 132
Without existing cassettes: still needs to be clarified,
35 Towers / Fields
Storage capacity: 1,473t
Over the years, various punching/laser machines have been connected to
this warehouse. i.e. machines with an interface to the warehouse.
Manual press brakes and deburring/grinding machines have no interface
to the warehouse. The in/out retrieval stations are controlled via the
warehouse management and manually moved from the warehouse to
position.
2013 > retrofit conversion:
4.1 Content of this restructuring in bullet points:
4.1.2 New main control panel with control computer
4.1.3 Data transmission to the storage and retrieval machine (RGB) via
data light barrier
4.1.4 Hoist with two new Profi-Bus encoders for height positioning
that monitor each other.
4.1.5 Transducer of the crosshead for the telescopic fork has been
replaced by profibus-capable encoders
4.1.6 RGB control cabinet has been completely renewed
4.1.7 new circuit diagrams for the RGB and the I/O modules have been
created.
4.1.8 The safety technology has not been changed
4.1.9 The speed of the axles (longitudinal chassis, linkage, fork) has
not been changed.
4.1.10 The drives on the RGB and the controllers in the stationary RGB
cabinet have been converted to asynchronous servo motors with FU.
5) 2015 > connection of Trumpf L3030 to our distribution line 2
5.1.1 Content of this restructuring in bullet points:
5.1.2 Conversion of stations 4 and 6, loading and unloading side has
been replaced
5.1.3 Safety interface conversion of stations 4 and 6 from 1 to
2-channel
5.1.4 Trumpf L3030 LiftMaster Connection
6) 2017 > commissioning of retrofit expansion stage concept stage 1-3
6.1 Content of the conversion stages 1-3 in bullet points (Implemented
by 08.2018)
6.1.2 Stage 1: Connection of the new TruLaser 3030 Loadmaster to VT 1
with modification of loading and unloading station 3 (GF and MF)6.1.3
Stage 2: Conversion of the steel construction blocks from MF to GF
(28, 30, 32, 34, 36) Relocation of stations 19 and 20 including update
of the station control from Siemens S5 to S7 including 56 flat pallets
GF6.1.4
Stage 3: Update of the station controllers on Siemens S7 without VT1
and VT2
7)2018 > commissioning of retrofit expansion stage concept stage 4-5
7.1. Content of the conversion stages 4-5 in bullet points (planned
implementation April – June 2019)
7.1.1 Stage 4:
7.1.2 Dismantling of the STOPA bearings SBLS Tower 1 and Tower 2 (own
contribution)
7.1.3 Modification of distribution lines 1 and 2
7.1.4 New distribution wagon 1
7.1.5 New control system for distribution lines 1 and 2
7.1.6 Level 5:
7.1.7 New warehouse management software STOPA WMS 4.0 DYNAMIC
The conversion of expansion stages 4 – 5 is being carried out
without any significant changes to the system and on the basis of the
updated safety measures
Condition: good
Available: immediately
Location: D, NRW
PDF plan is available – we will be happy to send it to you on
request!