1. EQUIPMENT OVERVIEW
SIEMENS SGT-500 GAS TURBINES
Quantity: Two (2) Units Available
Condition: New Surplus / Zero Hours
Manufacturing & Storage
• Manufactured in 2007
• New surplus, never used
• Zero operating hours
• Stored strictly in accordance with OEM preservation procedures
• Originally supplied for an FPSO project that was cancelled
Certification
• Marine Rated
• DNV (Det Norske Veritas) certified
2. GAS TURBINE – TECHNICAL DATA
• Model: Siemens SGT-500
• Configuration: Single-shaft industrial gas turbine
• Fuel: Dual fuel – Natural Gas / Diesel
• Frequency Capability: 50 / 60 Hz
Power Output (ISO conditions – indicative)
• Natural Gas: approx. 17.4 MW
• Diesel: approx. 17.0 MW
(Output may be slightly higher depending on site conditions)
Performance
• Specific Fuel Consumption
• 221 g/kWh (Natural Gas)
• 262 g/kWh (Diesel)
• Heat Rate
• 11,066 kJ/kWh (Natural Gas)
• 11,200 kJ/kWh (Diesel)
3. GENERATOR PACKAGE
• Manufacturer: ABB
• Year: 2007
• Type: AMS 900 LH
• Rated Output: 20,400 kVA at 35°C
• Voltage: 13.8 kV
• Frequency: 60 Hz
• Speed: 1,800 RPM
• Power Factor: 0.8
• Type: Synchronous generator
4. GEARBOX
• Manufacturer: Flender Graffenstaden (France)
• Rated Power: 22,500 kW
• Gearbox supplied complete with couplings and coupling guards
5. LUBE OIL SYSTEM
• Supplier: Flenco Group
• Marine rated
• Complete lube oil system included
• Fin-fan type lube oil cooler included
6. SCOPE OF SUPPLY – SKID-ONLY PACKAGE (INCLUDED)
The following equipment is included and supplied on-skid:
• Gas Generator & Power Turbine
• Gearbox with couplings and guards
• Sealing Air System
• Gas Fuel System (inside skid only)
• Liquid Fuel System (including liquid fuel forwarding pump
skid)
• Complete Lube Oil System (incl. fin-type cooler)
• Compressor Wash System
• Turbine combustion air inlet casing
• Exhaust plenum (inside skid)
• Base frame, enclosure and platform
7. PRICE – SKID-ONLY GAS TURBINE PACKAGE
Turbine + Generator + Gearbox + Housing
Price: on request
Delivery: Ex Works
Availability: Immediate shipment
8. NOT INCLUDED / REQUIRED BALANCE OF PLANT (BoP)
Mechanical (Off-Skid)
• Air intake system (filter house, ducting, silencers, weather
hoods)
• Exhaust system outside skid (silencer, expansion joints, main
stack 15–20 m)
• External cooling system and interconnecting piping
• Fire & Gas detection system
Fuel Conditioning
• Gas conditioning skid (filtration, heating, pressure
reduction)
Electrical
• Generator circuit breakers
• Generator control panels
• LV switchgear / MCC
• DC system (batteries & chargers)
9. ELECTRICAL EQUIPMENT E6237227 – OPTIONAL OEM SUPPLY
Transformer, auxiliary power supply and control panels must be
purchased separately, if required.
These items may be:
• Supplied directly by OEM (ABB) under a separate and independent
contract, or
• Procured independently by the customer.
If supplied by OEM:
• OEM warranty will be provided directly by ABB
• This constitutes a separate commercial deal, independent from the
turbine package.
10. OPTIONAL BoP SUPPLY (SUPPLY ONLY)
Indicative BoP supply (subject to final scope definition):
• Transformer
• Auxiliary power supply
• Control system (plant / BoP level)
• Compressed air system
• Off-skid air intake and exhaust systems
Indicative Price: on request
11. SERVICES (OPTIONAL)
• Start-up & commissioning: on request
(Applicable only if installation is performed by the same
contractor)
12. EXCLUSIONS / BUYER’S RESPONSIBILITY
• Civil works, foundations, ground preparation, fencing
• Warehousing and storage
• Local transportation
• Grid connection and cabling
• Gas pipeline connection
• Taxes, duties, customs clearance
We trust the above provides a clear and complete technical and