Powder coating plant (complete) with 3 zones of chemical pre-treatment
and Hybird ovens (dryer and curing oven)
Gas and electricity (gas or electricity also possible)
The facility consists of:
Chemical pre-treatment with reverse osmosis system
Dryer with hybrid thermoblock
Walk-in coating booth with extraction unit KG PSW 8000
Powder curing furnace with hybrid thermoblock
Conveyor system with transverse displacement, manual
Electric control unit
Specification of production
Type of workpieces varies
Material of the workpieces Steel (other metals or multimetal possible
on request)
Maximum weight of the load carrier 200 kg
System type: Manual conveyor
Dimensions of the maximum workpiece in the curing furnace
Max. length 3000 mm
Max. width 1500 mm
Max. height 1500 mm
Dimensions of maximum workpiece in chemical pretreatment
Max. length 3000 mm
Max. width 800 mm
Max. height 1500 mm
Energy supply
Energy for heating stoves Hybrid = natural gas + electricity
Heat output 115 kW
Energy to heat tank 1 electricity
Voltage 400V+N+PE
Frequency 50 Hz
Total electrical power 83 kW
The chemical pretreatment for the use of nanotechnology or phosphating
consists of 3 stages in 1 spray chamber. Chemical spray pretreatment
works in time and this means that the workpieces are manually pushed
into the chamber. After closing the doors, the passage starts and the
pumps start spraying. Each pump has different spray times. After the
spraying process is finished, there is an alarm indicating that the
door can be opened and the workpiece can be pulled out. All
pre-treatment functions are controlled by the main control panel.
Stage 1 is heated with a 72 kW electric heater
All images shown are sample examples and may differ from the
original