The distance indication is not possible, because your location could not be determined. Prerequisite is that your browser allows cookies and location determination.
turbines
date: 25.10.2023 add to watchlist
Machine: KKK 5 MWel steam turbine cond. Biomass plant
item-No.: 151372692
New in: 2001
used

Biomass Plant, 5 MWel, 50 Hz, yoc 2002, in operation Boiler • Technical data: - Fuel tank capacity: approx. 1 .300 m 3 - Exhaust gas volume 29,000 Nm3/h - Average combustion temperature of 900°C (850 for 2 s.) - Thermal power of the furnace 13 MW - 2 add. Burners 5 MW each - Average calorific value Hu 12,500 kJ/kg - Throughput capacity 3,991 kg/h - Boiler working pressure 41 bar - Superheated steam temperature 420°C - designed amount of steam 14 t/h - Fuels: RDF, wood chips, straw, remains of chipboard, choiceed waste Hours of operation of the entire plant appr. 120,000 hours Steam turbine - TWIN steam turbine KKK, type: CFR 3 / AFA 6 GTA - Generator AvK, type DIG 140 k/4W - Gearbox Renk, type: ELCO W-shape can be inspected in operation this week, - SGS can be ordered for inspection.

turbines
date: 25.10.2023 add to watchlist
Machine: SIEMENS SGT 400 Gas Turbine Package
item-No.: 162173340
New in: 2010
used

SGT 400 YOC 2010, 10.000 hours only 6 years in operation at peak load conserved 50 Hz 11 kV 14,300 kVA 1500 rpm still complete installed. relocation can be offered  ... more information

turbines
date: 25.10.2023 add to watchlist
Machine: KAWASAKI M1A-13D Kawasaki Gasturbine M1A-13D
item-No.: 123449031
New in: 1998
used

Gas turbine with generator model M1A-13D 2,500 hours after overhaul 50 Hz, 400 V, in excellent condition, extrated and ready for transport.  ... more information

turbines
date: 25.10.2023 add to watchlist
Machine: SOLAR Taurus 60 Solonox GAS TURBINE POWER PLANT 5 MW
item-No.: 112100661
New in: 2008
used

Manufacturer: Solar Turbines INC, San Diego USA Model: Taurus 60 with Solonox combustion, Packager: Turbomach Version: T 7301 Yoc package: 1998 Turbine engine: new engine installed in 2012, only few hours since installation Condition: fully serviced and ready for start. Capacity: 5200 kW Speed: 14.944 U/min continual Fuel: Natural Gas and Light Diesel (dual fuel) Fuel consumption: 122.469 kJ/kWh Burners: 12 Start system: electro.hydraulic, 90 kW Outlet temperature: 486°C Exhaust gas: 21.244 kg/s

turbines
date: 25.10.2023 add to watchlist
Machine: SOLAR Titan 130 Gas Turbine Package Titan 130
item-No.: 111576650
New in: 2005
used

Titan 130 package Year of construction 2005, new turbine, NOT overhauled 15.000 hours 11.8 MW 50 Hz Installed and in standby condition, maintained by Turbomach, immediately possible to extract and ship for exchange purpose  ... more information

turbines
date: 25.10.2023 add to watchlist
Machine: MAN, BLOHM + VOSS 7.2 MW, - Marc 2, B10 Steam Turbine 7 MW back pressure with extraction
item-No.: 110943987
New in: 2005
used

Steam turbine Type: B + V, MARC2 - B10, back pressure with extraction Live steam pressure 58 bar 60.5 bar max Live steam temp.: 510 ° C Steam quantity: 45 t / h Extraction pressure: 21 bar 24.0 bar max Extraction temp.: 383 ° C 490 ° C max Extraction quantity: 7 t / h t 15 / h max Exhaust pressure: 3 bar 4 bar max Exhaust temp. : 180 ° C 262 ° C max Exhaust quantity: 28 t / h 47 t / h max Speed: 10.043 RPM Quick closing speed: 11,047 RPM Gearbox Generator Manufacturer LEROY SOMER KV voltage 5.25 Frequency 50 Hz Speed of 1,500 RPM maximum 1,800 RPM Power: 9,000 kVA Power factor: 0.8 Year of construction 2005 Operating hours: 16,000

turbines
date: 23.02.2023 add to watchlist
Machine: MAN NR29/S TURBOCHARGER
item-No.: 160904102
new

NEW COMPLETE CARTRIDGE, READY TO ASSEMBLE ON ENGINE  ... more information

turbines
date: 22.05.2022 add to watchlist
Machine: ABB TPS 57 ABB
item-No.: 129839702
used

Dear's Sale, T/C complate ABB TPS 57 Recon, Good condition Regards +905323642509 info@kscege  ... more information

turbines
date: 22.05.2022 add to watchlist
Machine: ABB TPS 52 Turbine
item-No.: 125536923
used

Dear's Sale, T/C complate ABB TPS 52 Recon, Good condition Regards +905323642509 info@kscege.com  ... more information

Machine: SOLAR Titan 130, 51 MW CCGT-3 x 12 MW Gas Turbine Generator
item-No.: 146466961
New in: 2012
used

51 MW - CCGT comprising 3 x 12 MW Solar Gas Turbine generator and 1 x 15 MW steam turbine generator Model : TITAN 130 Capacity : 12 MW Voltage ; 11 KV / 50 Hz Qty : 3 sets Titan 130 + 1 set STG Year : 2012 Running hr : 6000 hrs since new  ... more information

Machine: GE PG9171E nos.  CCGT 180 MW 50 Hz each
item-No.: 146671739
New in: 2004
used

2 nos. GE PG9171E 180MW / 50 Hz gas fired combine cycle gas turbine power plant, year 2004, around 31,000 hr - 34,300 hr, Steam turbine is 60MW each , and complete with heat recovery boiler. Welcome enquiry for buying only 1 or 2 gas turbine or includes engineering works.  ... more information

turbines
date: 04.05.2024 add to watchlist
Machine: MACMON M 100 AD Tool Milling Machine - Universal
item-No.: 163739023
New in: 1997
used

x-travel: 310 mmy-travel: 340 mmz-travel: 170 mmControl: Heidenhain TNC 124 total power requirement: 5,5 kWweight of the machine ca.: 0,8 tdimensions of the machine ca.: mThe data for this ad was created with ModulMWS - the software solution of LogoTech oHG. ... more information